DyCarnica supports SCID projects as a management consultancy using an ECPM approach (Engineering, Construction & Procurement Management). Plant construction and the procurement of technical components are carried out directly by the operator or by suppliers contracted by the operator.
DyCarnica’s services are delivered on a project-specific, modular, and phase-based basis. Engagement takes place in clearly defined project phases at fixed prices. Each phase delivers clearly specified, verifiable results and can be concluded without any obligation to proceed further. This ensures a high level of cost predictability, transparency, and compliance with public procurement requirements.
The feasibility study, including an on-site assessment, typically constitutes the first project phase and is offered at a fixed price of EUR 22,500, plus a flat-rate travel expense allowance.
Capital investment costs for a new SCID installation are typically in a comparable range to conventional SNCR solutions. For retrofit projects, costs depend on the existing plant configuration and on any modifications required to the boiler and auxiliary equipment.
The SCID additive is supplied through a partner company within the framework of a pilot project and is tailored to the specific plant. An economic assessment of this cost component is an integral part of the feasibility study.